I added a stringer into the build and a layer of 12oz bi axial cloth so I could get away with using 1 piece of 1/2" marine ply instead of using a double layer of 1/2" plywood for the floor. The 1 layer of plywood eliminated extra weight and added material costs of 2 layers. It is much stronger than before. You might notice 2 copper bars epoxied and glassed in midway up the stringer. This is to allow me to drill and tap into to install the keel later on. In past they had cut an access hole in the floor so they could install the nuts and bolts for the keel. This created another problem of water getting into the floor.

Image

Image

Image

The floor is all installed.

Image

Ready to start working on the deck. More pics to follow in the coming weeks.
Everything always seems to take longer than expected to achieve a quality job.

_________________
Triad V21 - 300xs
19' J-craft - 175 opti
18' Pontoon - 115 opti
12' tinny - 9.9 merc


Top
 Profile Send private message  
 PostPosted: February 23rd, 2017, 5:52 am   
Team Member
User avatar

Joined: July 13th, 2012, 6:57 pm
Posts: 521
Location: Little Britain, ON
Nice tidy well thought out job.
Still have a soft spot for J's, my first boat was a 16' 4 cyl I/O. Was a turd but I liked it.


Top
 Profile Send private message  
 PostPosted: February 23rd, 2017, 6:29 am   
Member

Joined: October 13th, 2016, 5:58 am
Posts: 12
Location: Peterborough
Very nice work and good craftsmanship does take a bit more time but well worth it in the long run. The stringer down the centre is very interesting as well and a weight saver as well as you indicated.Keep those pictures coming.

_________________
19ft J Craft 200 Johnson
17ft J Craft 115 Johnson


Top
 Profile Send private message YIM  
 PostPosted: March 27th, 2017, 8:33 am   
Team Member
User avatar

Joined: April 2nd, 2012, 7:35 pm
Posts: 406
Location: Barrie, On
Got the underside of the deck cleaned up and installed back on the hull. Glassed the transom and nose first to align it straight and let it cure. I screwed these wood blocks inside and out to sandwich the hull and deck together to make a nice flush tight fit. Then I glassed strips in between all the blocks. It fits perfect now compared to before. Then removed the blocks after a couple days once it cured. This week I have to add a full layer of glass around the perimeter - inside and out. Then making templates for the bulkheads and side panels.

Image

Image

Image

Image

Image





Image

_________________
Triad V21 - 300xs
19' J-craft - 175 opti
18' Pontoon - 115 opti
12' tinny - 9.9 merc


Top
 Profile Send private message  
 PostPosted: March 27th, 2017, 9:07 am   
Member

Joined: August 22nd, 2013, 4:13 pm
Posts: 273
Looking good!!!


Top
 Profile Send private message  
 PostPosted: March 27th, 2017, 12:19 pm   
Member

Joined: October 13th, 2016, 5:58 am
Posts: 12
Location: Peterborough
Excellent, love the C clamps and ratchet straps to square everything back up, great idea, keep those pictures coming

_________________
19ft J Craft 200 Johnson
17ft J Craft 115 Johnson


Top
 Profile Send private message YIM  
 PostPosted: March 27th, 2017, 6:11 pm   
HPBC PRESIDENT
User avatar

Joined: March 31st, 2012, 5:53 pm
Posts: 3548
Location: Lapping lil charger
Great job Doug. I bet it feels good to get the deck back on!!

_________________
08 SRV w/3.1 Hydro-tec Phase lll

I've got enough torque to tear a hole....in time...


Top
 Profile Send private message  
 PostPosted: March 28th, 2017, 7:11 am   
Team Member
User avatar

Joined: April 2nd, 2012, 7:35 pm
Posts: 406
Location: Barrie, On
DoktorC wrote:
Great job Doug. I bet it feels good to get the deck back on!!


yes sir, thanks....my shoulders are still burning from working upside down rolling out the glass around the perimeter :cry: but I am glad I removed the whole deck versus cutting it off at the motor well. It made it much easier to replace the floor and the transom with the deck out of the way and I have acquired a better fitting hull to deck joint that won't require a whole tube of caulking to fill the voids like it had from the factory.

_________________
Triad V21 - 300xs
19' J-craft - 175 opti
18' Pontoon - 115 opti
12' tinny - 9.9 merc


Top
 Profile Send private message  
 PostPosted: March 28th, 2017, 4:50 pm   
User Requested 1 Month Ban - Denied

Joined: April 8th, 2012, 8:11 am
Posts: 1297
Nice work you Guy's …Capping her or putting the rub rail back on ?

_________________
DBR 300xs


Top
 Profile Send private message  
 PostPosted: March 28th, 2017, 4:59 pm   
Team Member
User avatar

Joined: April 2nd, 2012, 7:35 pm
Posts: 406
Location: Barrie, On
KAL Racing wrote:
Nice work you Guy's …Capping her or putting the rub rail back on ?


thanks Ken. Both. Capping the outer seam and still going to put the rub rail back on. It just helps for added protection.

_________________
Triad V21 - 300xs
19' J-craft - 175 opti
18' Pontoon - 115 opti
12' tinny - 9.9 merc


Top
 Profile Send private message  
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 44 posts ]  Go to page Previous  1, 2, 3, 4, 5  Next

All times are UTC - 5 hours [ DST ]


Who is online

Users browsing this forum: No registered users and 1 guest


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
Jump to:  


Powered by phpBB © 2000, 2002, 2005, 2007 phpBB Group
Style originally created by Volize © 2003 • Redesigned SkyLine by MartectX © 2008 - 2010